loader
Explore our new 290 long lasting colours with excellent weather durability.
  • Floorsports 1K Epoxy Hybrid

FLOORSPORTS 1K EPOXY HYBRID is an Epoxy Hybrid coloured 1-pack water-based floor coating, designed for multi-purpose sports flooring, bicycle and pedestrian lanes in parks and recreational areas, internal and external floor. Varying thickness can be achieved from 0.20mm to 1.0mm by selected aggregate, by roll and trowel application.

Product Features:
• Excellent resistance to UV radiation
• Excellent abrasion resistance & great durability
• Excellent breathability performance
• Good aesthetic finish and easy application
• Filled with quartz for varying thickness

Additional 1 coat of FloorShield WB PU Clear Matt for INTERIOR & SEMI EXPOSED AREAS for all systems - provides better hardness & abrasion resistance

Coating System
Application

Coating System

Concrete Surface - Smooth Finishing
Type Product Name No. of Coat(s)
Primer/Sealer High Performance Primer 1 coat
Intermediate Floorsports 1K Epoxy Hybrid 2-3 coats
Concrete Surface - Anti-Slip Finishing (Roller Application)
Type Product Name No. of Coat(s)
Primer/Sealer High Performance Primer 1 coat
Intermediate Floorsports 1K Epoxy Hybrid (20% Non-skid sand 103 Fine, 5% water dilution) 1 coat
Topcoat Floorsports 1K Epoxy Hybrid 1 coat
Concrete Surface - Anti-Slip Finishing (Trowel/Squeegee Application)
Type Product Name No. of Coat(s)
Primer/Sealer High Performance Primer 1 coat
Intermediate Floorsports 1K Epoxy Hybrid (20% Non-skid sand 103 Fine) 1 coat
Topcoat Floorsports 1K Epoxy Hybrid (20% Non-skid sand 103 Fine) 1 coat
Concrete Surface - Shock Absorbance System
Type Product Name No. of Coat(s)
Primer/Sealer Floorsports Mastic (20% Dilution with water) 1 coat
Intermediate Floorsports Mastic 1-2 coats (1mm/coat)
Topcoat Floorsports 1K Epoxy Hybrid (20% Non-skid sand 103 Fine) 1 coat

Application Data

Application Roller/Trowel
Thinning No dillution is required for roll and trowel application
Touch Dry/ Hard Dry 30 minutes / 2 hours
Recoating Interval Minimum 6-8 hours
No. of Coat(s) 2-3 coats
Theoretical Coverage Brush/Roller: 0.10 – 0.20kg/m2 per coat

Trowel: 1.0 kg/m2 (for dry film thickness of 350 microns)